Go Back   PowerStrokeArmy > Sponsors > The PX > Hallers Repair & Performance

Reply
 
Thread Tools Display Modes
  #1  
Old 11-07-2011, 04:57 PM
Corb@CorbinShipping's Avatar
Corb@CorbinShipping Corb@CorbinShipping is offline
Sponsor
Member's Gallery
 
Join Date: Sep 2011
Location: Autryville, NC
Posts: 3,063
Default I posted over on TOW-RIG

And it was suggested to ask you. Hopefully you can help out, and everyone can learn form my question.

How much do you have to shorten the drive shaft when using one?

I have a cclb DRW, and a ccsb SRW. Both 2010s. I am going to run an OD unit on the cclb DRW. Can I take the unit off of the ccsb SRW and use it on the cclb DRW with the Gear Venders? Or is there a specific length that needs to be achieved? I am going to replace the shaft on the ccsb with a CV jointed two piece shaft, and I would hate to waste the one that comes off, as it is in good order. And, would also hate to pay more money to shorten the cclb DRW setup, if I can use the leftovers of my azz hauler.

I don't know if anyone has done this, and came up empty on a search. Thanks for any input,
corb
__________________
Corbin Shipping, LLC.
Autryville, NC
(910) 578-4960 Call/text for quotes
Corbin.shipping@gmail.com
Veteran owned, Veteran operated

2013 F350 CCLB DRW 75mm Add a turbo <FOR SALE>
2010 F250, Harley Edition. getting closer...
2017 F350 CCLB DRW Platinum Ultimate...
2008 RCLB XL, Short bed conversion about to begin...
SDRCM # 1691
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 10:27 AM.

 

Powered by vBulletin®
Copyright ©2000 - 2018, vBulletin Solutions, Inc.

Designed by Military Ltd