TrickTruck
Member
All the stuff and more in my sig. Returned to stock to trade. ~50 hours of hard labor!!!
Not sure which part I liked the least, but putting the D P F back on would have been high on that list. E G R wasn't fun either.
Easiest: front suspension.
I cannot believe I had 4 long days in this project, but I did. And am only at the halfway point too. Still need to put all this crap back on the new '16 :fustrate:
Not sure which part I liked the least, but putting the D P F back on would have been high on that list. E G R wasn't fun either.
Easiest: front suspension.
I cannot believe I had 4 long days in this project, but I did. And am only at the halfway point too. Still need to put all this crap back on the new '16 :fustrate: