Just figured Id share the somewhat mild build Im doing for my friend Jeff (05sixliter) that ended up turning into a lot more than originally planned. Jeff has been helping out as his time has allowed, and he is heading back home to Viriginia now and will come back for a weekend when Im ready to put everything back in the truck.
Several months ago the truck dropped #7 injector so it sat for a while til he could get a set of injectors. Couple weeks ago we pulled the injectors to have them sent off to be built so they would be ready to install when I pulled the cab the next week to do studs. When I went to pull the heads off though we found an unexpected surprise. The injector must have hung wide open and melted the glow plug and the piston on #7
So we pulled the engine out and I tore the block down and took it to the machine shop yesterday. The block was in a little worse shape than I expected for only having 105k miles on it. The rod bearings all were not wearing well and there were grooves in the crank from some grit that was on the bearings. IPR screen had plenty of metal shavings in it as well. Im hoping that the machine shop will be able to polish the grooves out since they arent too deep. Most likely the cylinders will have to go .010 over. The heads are all finished, just had some cracks in the exhaust seats so thats taken care of. 80% of the valve guides were wore out and there were 8 bent or poorly worn intake valves and 4 bent exhaust valves.
Ill keep the build updated, as of now its just a waiting game with the machine shop. Here is the build list.
Heads:
All new valve guides
All new valve seals
8 new intake valves
4 new exhaust valves
.004 taken off the deck
All hardened exhaust valve seats
Injectors
190/100s from Warren
Fuel System
Regulated return from Greg (Pizza Pig)
Jeff is also trying to work up funds for a fuel lab pump and filter bases as well
Retaining the stock turbo for now until he has the funds down the road
Block
Polished crankshaft
Block decked
Main honed
Cylinders bored .010 over
Rod and main bearings
Pistons, wrist pins
New lifters
New water pump
New oil cooler
Cam bearings
Egr delete which I had installed a while ago
ARP studs w/ ford gaskets
Heading to the shop
Cab up
Melted piston
Engine out
Block tore down
Block headed to the machine shop
Heads back from the machine shop
Several months ago the truck dropped #7 injector so it sat for a while til he could get a set of injectors. Couple weeks ago we pulled the injectors to have them sent off to be built so they would be ready to install when I pulled the cab the next week to do studs. When I went to pull the heads off though we found an unexpected surprise. The injector must have hung wide open and melted the glow plug and the piston on #7
So we pulled the engine out and I tore the block down and took it to the machine shop yesterday. The block was in a little worse shape than I expected for only having 105k miles on it. The rod bearings all were not wearing well and there were grooves in the crank from some grit that was on the bearings. IPR screen had plenty of metal shavings in it as well. Im hoping that the machine shop will be able to polish the grooves out since they arent too deep. Most likely the cylinders will have to go .010 over. The heads are all finished, just had some cracks in the exhaust seats so thats taken care of. 80% of the valve guides were wore out and there were 8 bent or poorly worn intake valves and 4 bent exhaust valves.
Ill keep the build updated, as of now its just a waiting game with the machine shop. Here is the build list.
Heads:
All new valve guides
All new valve seals
8 new intake valves
4 new exhaust valves
.004 taken off the deck
All hardened exhaust valve seats
Injectors
190/100s from Warren
Fuel System
Regulated return from Greg (Pizza Pig)
Jeff is also trying to work up funds for a fuel lab pump and filter bases as well
Retaining the stock turbo for now until he has the funds down the road
Block
Polished crankshaft
Block decked
Main honed
Cylinders bored .010 over
Rod and main bearings
Pistons, wrist pins
New lifters
New water pump
New oil cooler
Cam bearings
Egr delete which I had installed a while ago
ARP studs w/ ford gaskets
Heading to the shop
Cab up
Melted piston
Engine out
Block tore down
Block headed to the machine shop
Heads back from the machine shop