UNBROKEN
Active member
- Joined
- May 18, 2011
- Messages
- 2,788
- Reaction score
- 1
My time is very limited these days but it's past time to get this delete stuff done.
How long did it take yall to do delete pipe and EGR deletes?
I have the H&S IC pipe too but I'll probably slip that in one afternoon. I need to get an idea on how long it takes for the other stuff so I can schedule some time on our lift at work. I'll have a fully stocked shop to work in including a 4 post lift so that should help.
How long did it take yall to do delete pipe and EGR deletes?
I have the H&S IC pipe too but I'll probably slip that in one afternoon. I need to get an idea on how long it takes for the other stuff so I can schedule some time on our lift at work. I'll have a fully stocked shop to work in including a 4 post lift so that should help.