Dakotakid
New member
Got my gauge in to monitor the new 155s......too bad I couldn't find a King Ranch factory match gauge. Settled with a autometer phantom 2.
[/URL][/IMG]
Got my gauge in to monitor the new 155s......too bad I couldn't find a King Ranch factory match gauge. Settled with a autometer phantom 2.
Any thoughts on these yet? I'm seriously thinkin about this myself.It was more removing the HIDs than it was installing the LEDs. Haven't driven after dark yet but they look better than the HIDS against the garage door.
That's weird. I've never had a hard time pulling the tc out. Might have something to do with your leakDone. 2.5 hours total. It seems I've welded the tc in with all the powah my truck makes.
That's weird. I've never had a hard time pulling the tc out. Might have something to do with your leak
nice!!Ordered a set of "Load Lifter 5000" Air Lift bags today. Should help prevent bulldogging when I have a big trailer on it, lol
Came to $250 shipped, and qualifies for a $50 rebate as well, so bags for $200 with a lifetime warranty....good deal!
holy ***! we did almost the exact same thing.. only I blew my head gaskets Wednesday night, pulled motor Thursday and had the heads tore off, friday at 11am I started working on buffing/cleaning tye block and heads, assembled motor and put back in the truck throughout the night and had it fired back up by 10am Saturday morning. put 45-50 miles on it and loded it on the trailer and went to a pull....Wednesday: picked up all my parts to get my engine built up.
Thursday and Friday: put engine together
Saturday 11am, fire up engine proceed with recomended breakins. Loaded on trailer headed to pull.
Saturday night, Truck got hooked to sled, Truck thought it was a rabbit.
Sunday drove to another local pull. Hooked in two clases using different tunes trying to figure out this trucks new attitude.
in 30 hours time. Started engine, hooked three times and put 180 miles on it. Sounds like a good break in to me.
nice!!
holy ***! we did almost the exact same thing.. only I blew my head gaskets Wednesday night, pulled motor Thursday and had the heads tore off, friday at 11am I started working on buffing/cleaning tye block and heads, assembled motor and put back in the truck throughout the night and had it fired back up by 10am Saturday morning. put 45-50 miles on it and loded it on the trailer and went to a pull....
live life full throttle
im still paying for it. I didnt place in the money this time either. but I have a rpm issue im trying to figure out now...Yup, from bare block to sled hooked in 54 hours. was a rough few days.