Well it has started..
Nothing crazy yet, more of getting the motor ready for more power coming in the new year. Turns out both head gaskets were blown but I was able to get to them in time to prevent any short block issues. Heads are on there way to the machine shop as I post and still waiting on my fuel rails but if all goes well the truck will be done this weekend. Not a bad job for a monday evening worth of work between a few people so far.
Mods:
ARP headstuds
Kelly Diesel EGR delete
Elite Diesel ported fuel rails
All new gaskets
I'm very excited to say the least. Plans are to get everything done, load a new tune and head to the Beans dyno day on December 10th.
Huge thanks to Bryan R, Matt P, Mike W, Matt K for the help with Labor/parts and that one guy that owns a barn with a hoist in MingoLOL
Nothing crazy yet, more of getting the motor ready for more power coming in the new year. Turns out both head gaskets were blown but I was able to get to them in time to prevent any short block issues. Heads are on there way to the machine shop as I post and still waiting on my fuel rails but if all goes well the truck will be done this weekend. Not a bad job for a monday evening worth of work between a few people so far.
Mods:
ARP headstuds
Kelly Diesel EGR delete
Elite Diesel ported fuel rails
All new gaskets
I'm very excited to say the least. Plans are to get everything done, load a new tune and head to the Beans dyno day on December 10th.
Huge thanks to Bryan R, Matt P, Mike W, Matt K for the help with Labor/parts and that one guy that owns a barn with a hoist in MingoLOL