4EverBoosted1
Active member
- Joined
- Jan 29, 2012
- Messages
- 1,724
- Reaction score
- 0
I wasn't insinuating anything. Just figured since all this piping was "finished" and it was "almost ready to start", that we would have seen a completed or at least any signs of a down pipe. You and I both know very well how long it can take to finish all the last little details on builds like this. Even after it has already started for the first time. Just saying, it looks like there is a solid week of finishing, unless these pics are just old ones. Hopefully they got it all straightened out as close as it is to time.
Exactly. We had so many pictures of piping and "finished" portions that actually were completely torn down and re-constructed later to function correctly with every other part. There is a HUGE difference between "starting" a truck and "driving" it. ---- a lesson that I learned from morgan and colton.. just because it starts, does not mean it can idle in traffic or make 100+ mile trips.