SSpeeDEMONSS
New member
Looking good. What size pipe from secondary to primary?
Garrett
probably getting paid at work to post this from my bionic
Garrett
probably getting paid at work to post this from my bionic
yeah I just built an L bracket and mounted the pump and 4x4 solenoid back to back then bolted the bracket to the inside of the qtr panel. basically same location. I did leave the vac reservoir off and just plugged the lines directly into the pump
Ahhh my bad. ATP should have that material and you should be able to get them bead rolled at any local machine shop.
Thought I'd update this. The injectors are on there way back, and are now in the US finally! UPS held them awaiting for confirmation on my tax ID. Intercooler piping is all done, and sealed up. (Pressure tested)
Down pipe is in progress, not much left. Finally finished a 5 O.D." 90° bend with a 5" overall length. CLR is TIGHT
Curious on some of your opinions....relocating my FICM... My CCV is a hair too tall for the FICM to bolt on to the factory brackets, so I need to do something with the location. What do you guys think? I know there is an e series option..
any pics of the down pipe? I bet the 5'' looks big in the finderwell lol
I'd like to see you move the FICM to the fender, that is what I want to do with mine for more room.
Garrett
probably getting paid at work to post this from my bionic
I'll get photos of the DP once its all done. Lol It's not small. Once the 90 clears the HVAC box, it reduces into 4". Just didn't have any room to reduce, and bend at the same time.
Ah I was thinking it was 5" all the way.
I've done it but you have too short cut the 90